DIRTWORKS

Class "A" General Engineering β€” CSLB #1048702
EQUIPMENT & CREW CONFIGURATOR
New Job β€” click Setup to fill in project info
1. Setup
2. Recommended Equipment
3. Equipment List
4. Labor Rates
5. Crew Builder
6. Report

PROJECT INFORMATION

Job identity. Estimator stamp.
Project Name
Project Number
Client
Project Address
Engineer / Architect
Estimator
Bid Due Date
Date Prepared

GLOBAL JOB FACTORS

Adjust every rate downstream.
Fuel price$/gal
Operator efficiencymin/hr
Shift lengthhr/day
Days / weekdays
Site elevationft
Ambient temperatureΒ°F
Material β€” dominantβ€”
Bank densitylb/BCY
Load factorfactor
Haul-road conditionβ€”
Rolling resistance%
Travel-grade β€” adverse loaded%
Travel-grade β€” favorable empty%
Owned vs Rentalβ€”
Cost markup on rates%
Operators are not included in equipment rates. Build labor separately on the Crew tab.

EQUIPMENT LIST β€” PROJECT-ADJUSTED RATES

Owned/EOE rates adjusted for fuel price and operating mode set on Setup.
Index Equipment / Description Size / Model Owned $/hr Rental $/hr Fuel gph EOE $/hr Equip $/hr Default Prod

LABOR RATES β€” MASTER ESTIMATE

Edit any cell. Click Reset Defaults to restore base wages.
Class Code Classification Base Wage FICA FUTA/SUTA Workers Comp Fringe Total Burden All-In $/hr

CREW SHEET β€” EQUIPMENT, PRODUCTION, COST

Pick equipment from the dropdown. Production scales with your inputs.
Equipment # Hr/Day Days Equip $/hr Day Cost Total Cost Per-Piece Input Default Prod Adjusted Prod Unit
EQUIPMENT TOTAL β€” $0
Adjusted production uses transparent industry formulas β€” replace coefficients with your fleet history before bid-day commitment.

CREW LABOR

Operators and field labor β€” separate from equipment rates.
Code Classification # Hr/Day Days All-In $/hr Day Cost Total Cost
LABOR TOTAL β€” $0
Equipment Total
$0
Labor Total
$0
Crew Grand Total
$0

JOB REPORT β€” PRINTABLE SUMMARY

A clean one-stop summary. Use Print / PDF in the toolbar to export.
Brand & Document Style Guide v5.0